Wide Plank Flooring Installation & Adhesive Guidelines
The short answer: Vermont Plank Flooring must be installed to the National Wood Flooring Association (NWFA) Installation Guidelines, always with adhesive. Planks 4″–8″ wide are nailed with a glue assist. Planks 9″ and wider get full-spread glue with a nail assist. Over a concrete slab, our engineered planks can be glued directly to the slab with full-spread adhesive. Keep the room at 35–55% relative humidity before, during and after installation.
Which installation method do I use?
Moisture barrier for all methods, if applicable: WAKOL PU 280 Moisture Barrier (roll-on), or similar.
Before you install
Combining mechanical fastening with adhesive adds holding power across the full width of the plank. It helps prevent movement and squeaks, and minimizes gaps caused by changes in humidity.
- Condition the project site to normal living conditions: HVAC running, temperature and humidity stable.
- Maintain 35–55% relative humidity, as required by the Vermont Plank Flooring warranty.
- Start with a flat subfloor free from dirt and dust.
- Read the entire applicable section of the NWFA Installation Guidelines before beginning.
4″–8″ plank widths: nailing with glue assist
NWFA Installation Guidelines, p. 130
Nails or staples are the primary fastener; a bead of adhesive is the secondary fastener.
- Start with a flat subfloor free from dirt and dust. If applicable, roll on the moisture barrier.
- Apply a bead of adhesive in a wavy “S” pattern on the back of each plank.
- Nail every 6″–8″.
- Recommended adhesive
- WAKOL MS 262 Wood Flooring Adhesive (firm-flexible), or similar
- Moisture barrier
- WAKOL PU 280 (roll-on), or similar, if applicable
9″+ plank widths: full-spread glue with nail assist
NWFA Installation Guidelines, pp. 132–139
Troweled adhesive covering the entire subfloor is the primary fastener; nails or staples are the secondary fastener.
- Start with a flat subfloor free from dirt and dust. If applicable, roll on the moisture barrier.
- Lay out planks 100 sq ft or less at a time and cut to length.
- Remove the planks and trowel on the adhesive.
- Lay the planks into the wet adhesive immediately (“wet lay”).
- Nail every 6″–8″.
- Recommended adhesive
- WAKOL MS 260 Wood Flooring Adhesive (firm-flexible), or similar
- Moisture barrier
- WAKOL PU 280 (roll-on), or similar, if applicable
Engineered planks direct to a concrete slab: full-spread glue
NWFA Installation Guidelines, pp. 134–139
Planks are glued directly to the concrete slab with no mechanical fasteners. Vermont Plank Flooring’s engineered planks (5.2 mm sawn wear layer on a birch plywood core, up to 12″ wide) can be installed this way. Over a wood subfloor, engineered planks use the method for their width above.
- Start with a flat subfloor free from dirt and dust. If applicable, roll on the moisture barrier.
- Lay out planks 100 sq ft or less at a time and cut to length.
- Remove the planks and trowel on the adhesive.
- Lay the planks into the wet adhesive immediately, and weigh them down to keep rows tight while the adhesive sets.
Pro tip: Install an anchor row the day before so the flooring doesn’t move while the rest of the floor is installed.
- Recommended adhesive
- WAKOL MS 290 Wood Flooring Adhesive (firm), or similar
- Moisture barrier
- WAKOL PU 280 (roll-on), or similar, if applicable
More on slabs: Wide plank flooring on concrete
Over radiant heat
Both our solid and engineered wide plank floors are rated for radiant heat. Keep the floor surface at 80°F or below and the room at 35–55% humidity. See Wide plank flooring over radiant heat for system types and start-up.
Common questions
Do I have to use adhesive?
Yes. The NWFA guidelines we follow require adhesive, or adhesive combined with nails or staples, for our wide plank floors.
Can engineered wide plank flooring be glued to concrete?
Yes. Our engineered planks can be glued directly to the slab with full-spread adhesive and no mechanical fasteners. Solid planks need a wood subfloor over the slab. Engineered planks also go over a wood subfloor, nailed and glued like solid.
Which adhesive should my installer use?
WAKOL MS 262 for 4″–8″ nail-and-glue installs, MS 260 for 9″+ full-spread installs, and MS 290 for engineered on concrete, or similar products. Always follow the adhesive manufacturer’s instructions.
Does Vermont Plank Flooring install floors?
No. We mill and finish the flooring and ship it nationwide. We’re happy to recommend experienced installers in your area.
Downloads
Product recommendations are for guidance; always follow the adhesive manufacturer’s instructions. Questions? Call (802) 441-0981.







